Installation of post-tensioning system – it is a great responsibility and it cannot be done without special training.
Descon specialists have necessary qualifications and experience required for carrying out a full range of installation and assembling works of the post- tensioning system directly on site. In addition, our staff strictly follows the approved schedule of constructions works and do not allow any violation of the building standards (Euro Code (EC2) and/or SNiP/SP2) set in the project.

uslugi_montaje_01 uslugi_montaje_02However, might the work with post-tensioned concrete systems be a common practice for you, we do offer an installation supervision of post-tensioning systems. In this case our specialist will be also on the construction site to provide necessary recommendations, supervise the whole construction process and control that the works are performed in accordance with the approved project and general rules of construction works.

When assembling  post-tensioning system, the following works are carried out:

 

  • Installation of anchorage system;
  • Laying out and anchoring of tendons;
  • Inspection of installed system before pouring concrete;
  • Stressing of tendons after concrete has reached the required strength (hardness);
  • Finishing works by injecting the mortar and sealing the pockets;
  • Preparation of reporting and executive documents of stressing and installation.